-
crossover tracks connect to sidings
Closed
-
Most rails at Karlstad C are now nearly done. Many tags removed from them since they kayout is largely redone, and it might be best to 'start fresh' on many of the parts.
Closed
-
shape
Closed
-
accesses changed along Trädg.g
Closed
-
Ö Torggatan partially reopened for dead-end traffic. Construction area withdrawn.
Closed
-
some walls for the Viken passage
Closed
-
corner tweak
Closed
-
approx positioning of new switches being built
Closed
-
geometry
Closed
-
path is open
Closed
-
geometry
Closed
-
adjustments signals
Closed
-
adjustments and addition of features near Löfbergsviadukten
Closed
-
tweaking sidewalk to fit current situation during road works.
Closed
-
bike and ped paths on Ö Torggatan are being opened.
Closed
-
fix access
Closed
-
draft of new layout for bike/ped paths, pavements, and crossings, near new roundabout.
Closed
-
footpath/sidewalks on pedestrian area at Trädg-g bridge.
Closed
-
surface
Closed
-
platform pathing tweaks
Closed