-
Xing detailing and ped infra work in the vicinity of Monterey & Skyline
Closed
-
Worked on the Laredo Sub from S of Corpus Jct up to US 90 including QZ detailing. Gen. Hudnell Drive clearance and lighting work. Add some ped infra while I'm in there.
Closed
-
Map some farmland and drainage + update a few crossings NW of Donaldsonville
Closed
-
Work on low clearances and the Interurban Trail + some rail detailing at the south end of Kent (the yard there is nowhere near finished though)
Closed
-
San Marcos QZ and rail detailing + ped infra and a bit more detail around the W?WTP
Closed
-
More Beech Siding work
Closed
-
Add low clearance on IA92 SE of Des Moines and add the missing Beech Siding to the Trenton Sub. Also fix some hydrology, detail a few crossings, and add some farmland.
Closed
-
Crossing fix near Camp Claiborne
Closed
-
Rail work around El Paso Amtrak
Closed
-
Work on xing and rail detailing from Ocean Springs to South Pascagoula
Closed
-
Rail work and some clearances and ped infra from Kirby SW to E Yard
Closed
-
Work on advisory maxspeed signage and a bit of hydrology in the Woodson area
Closed
-
Add low clearance west of Alpine
Closed
-
Add low clearance south of Granger and map a bit of farmland + tweak some rail stuff as well
Closed
-
Some fixes @ both ends of Trammel Road in the NLRK area
Closed
-
Farmland, road, and drainage fixes W of Beaulieu
Closed
-
Work on an industrial plant and some rail/xing detailing in Brighton. Add some ped infra and start ungluing landuses while I'm at it
Closed
-
Add low clearance between Sloan and Jean
Closed
-
Work on xing and rail detailing in the Ocean Springs area.
Closed
-
Finish rail and xing detailing work on the westside of Tucson with the last of the QZed xings and rail down to the Rillito River bridge.
Closed