1. Fixed Bryn Mawr Meadows (realigned paths and borders, added missing buildings))

    Closed
    #111392815 237 213 56 0
  2. Houses and Garages between Penn and Cedar Lake Rd (southwest of Downtown Bryn Mawr) completed

    Closed
    #111392245 942 7 0 0
  3. Added all shops and buildings in Downtown Bryn Mawr, also deleted a handful of nonexistant bus stations along Cedar Lake Rd between Penn Ave S and Glenwood Ave

    Closed
    #111390395 54 26 16 0
  4. House completion between Oliver Ave and Cedar Lake Rd

    Closed
    #111388607 345 22 5 0
  5. Theodore Wirth Park adjustments and some sidewalks

    Closed
    #111383892 89 79 21 0
  6. Utepils-Fruen Mill industrial area cleanup

    Closed
    #111382238 101 94 15 0
  7. railway corridor test

    Closed
    #111360478 19 45 11 0
  8. changed all the buildings to houses

    Closed
    #111359916 12 521 0 0
  9. Added Bryn Mawr Presbyterian Church and all Commercial Areas within Bryn Mawr

    Closed
    #111359763 24 35 4 0
  10. fixed basset creek park and anwatin school grounds borders

    Closed
    #111359309 123 103 28 0
  11. Added houses between Penn, Oliver, and Cedar Lake Road, straightened roads all over Bryn Mawr, added shops at the 400 Cedar Lake Rd S Triplex

    Closed
    #111348965 387 46 6 0
  12. Fixed Mobil gas station, added row of houses on Penn Ave S

    Closed
    #111267455 116 7 9 0
  13. Added the Bryn Mawr Mobil gas station and its two pumping stations. Is my first edit, so saving early to see what it looks like on the map and if i did it right

    Closed
    #111265827 18 1 0 0