Added path from Moss to Bubb/Siss and over to Rt 28
Some tweaks to Oak Hill trails over by Rt 3
Add other path over from Shakespeare St. Clean up some overlap.
Completed pond loop. Added outer loop toward Shakespeare Street.
Added some more connectors/small trails in the IACS trail system. Still need to complete pond trail.
Added two more paths from the IACS trail system.
Added little path that connects the end of the Stone Arch Bridge path to Milot Road
Added first pieces of the IACS trail system.