-
Mops benches and foot paths
Closed
-
Add a single swing
Closed
-
New speed tables
Closed
-
correcting the sport pitches
Closed
-
Updated the Kleistpark playground
Closed
-
Playground upgrade
Closed
-
Details for Lindenspielplatz
Closed
-
Specify whether pitches are lit
Closed
-
entrances
Closed
-
construction area and surrounding crossings
Closed
-
Survey if places still exist
Closed
-
Specify surfaces
Closed
-
correct footway
Closed
-
fix geometry
Closed
-
benches and moved sprintout to actual location
Closed
-
park cleanup
Closed
-
fixed minor positions
Closed
-
added entrances
Closed
-
added playground equipment, benches and corrected stuff
Closed
-
Survey if places still exist
Closed