1. adjust type

    Closed
    #129429721 0 22 0 0
  2. adjust from proposed to under construction; early works has started, and proper construction is set to start early next year

    Closed
    #129425888 0 22 0 0
  3. Willis Island is an actual island, unlike the others

    Closed
    #129363615 0 1 0 0
  4. adjust – this small bit of the exit is paved

    Closed
    #129343944 4 5 0 0
  5. add surface exit ramps

    Closed
    #129117136 20 8 0 0
  6. add tunneled exits

    Closed
    #129116981 18 2 0 0
  7. exit number does not exist

    Closed
    #129116681 0 1 0 0
  8. add M6 stage 1. construction has started, though the design is a bit sketchy. please adjust if necessary

    Closed
    #129116635 39 2 0 0
  9. add wikidata item

    Closed
    #129071144 0 1 0 0
  10. per https://yukon.ca/en/places/tombstone-interpretive-centre

    Closed
    #129071100 0 1 0 0
  11. extend M12 to airport per EIS statement https://caportal.com.au/rms/m12/map

    Closed
    #128842737 37 5 0 3
  12. add wikidata item

    Closed
    #128832283 0 1 0 0
  13. I think it's pretty unambiguous that a highway with at-grade junctions and a speed limit of 80 km/h running right through the middle of a town is not a motorway or even a high-speed dual carriageway (in NSW terms).

    Closed
    #128831309 0 8 0 0
  14. add French name (from Wikidata)

    Closed
    #128800100 0 1 0 0
  15. add wikidata item

    Closed
    #128762583 0 1 0 0
  16. adjust right turn in line with satellite imagery

    Closed
    #128762528 4 3 0 0
  17. complete link

    Closed
    #128723051 21 7 0 0
  18. add onramp

    Closed
    #128722888 12 3 0 0
  19. add new Berrimah Road exit; see https://dipl.nt.gov.au/projects/tiger-brennan-drive-and-berrimah-road-intersection-overpass

    Closed
    #128722668 18 3 0 0
  20. add lanes

    Closed
    #128668016 0 11 0 0