Rylander1's Notes
Notes submitted or commented on by Rylander1
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 4115733 | Rylander1 | The bridge across the canal is closed for repairs. Notice states that the bridge will be closed until June 22nd 2024 or until repairs have been carried out. |
|||
| 3628750 | Rylander1 | The bridge has been closed as it is considered unsafe. There is a Temporary Notice to this effect covering the period April 3rd 2023 to April 23rd 2023. The notice suggests that this closure may continue for a further period. |
|||
| 3595222 | Update: No access from or to Bridge Foot. Footpath closed for 300 m South West from Bridge Foot.
|
||||
| 3439040 | Path now accessible from Bridge Foot. There are still obstacles on the path walking away from Bridge Foot:(1) a metal fence with a narrow gap at the side to squeeze through (2) a locked gate with a side fence that needs to be climbed over. No sign of restoration after floods earlier this year and no indication when the path will be fully accessible. |