OpenStreetMap logo OpenStreetMap

Rylander1's Notes

Notes submitted or commented on by Rylander1

Id Creator Description Created at Last changed
4115733 Rylander1

The bridge across the canal is closed for repairs. Notice states that the bridge will be closed until June 22nd 2024 or until repairs have been carried out.

3628750 Rylander1

The bridge has been closed as it is considered unsafe. There is a Temporary Notice to this effect covering the period April 3rd 2023 to April 23rd 2023. The notice suggests that this closure may continue for a further period.

3595222

Update: No access from or to Bridge Foot. Footpath closed for 300 m South West from Bridge Foot.
Notice says that footpath to be restored by April 25th 2023.

3439040

Path now accessible from Bridge Foot. There are still obstacles on the path walking away from Bridge Foot:(1) a metal fence with a narrow gap at the side to squeeze through (2) a locked gate with a side fence that needs to be climbed over.

No sign of restoration after floods earlier this year and no indication when the path will be fully accessible.