Newly opened section of Greensboro Urban Loop (I-785/Future 840)
ProjectPA: PA 21 (Wind Ridge to Jacobs Run Road)
Ramp permanently closed, is new ramp open yet?
ProjectPA: PA 21 (WV state line to Wind Ridge)
Undoing and correcting strange classification changes near Pittsburgh Int'l Airport
Red Rose Transit: (2) Park City B 6th Ward
Red Rose Transit: Early Harrisburg Pike work in advance for Route 2 mapping
Red Rose Transit: Early work downtown in advance for Route 2 mapping
Red Rose Transit: Route 1 -- Park City A Southeast
ProjectPA: US 20 directional route relations
ProjectPA: US 20 (North East to NY State Line)
ProjectPA: US 20 (PA 955 to North East)
ProjectPA: US 20 (Water Street to PA 955)
Reroute of US 158 (Did Strategic Corridor 37 get rerouted as well?)
ProjectPA: US 20 (Broad Street to Water Street)
ProjectPA: US 20 (PA 8 to Bayfront Connector)