-
Refined alignment Chinchilla Wondai Road. Survey with GPS 24 May 2025.
Closed
-
Adjusted alignment Woolletts Road. Survey with GS 24 May 2025.
Closed
-
Adjusted alignment Shellytop Road. Survey with GS 24 May 2025.
Closed
-
Refined alignment, added river crossing name and added sealed section Shellytop Road. Survey with GS 24 May 2025.
Closed
-
Added missing road, no apparent name but letterboxes at junction numbered as shellytop road. Survey at junction 24 May 2025, Bing aerials.
Closed
-
Refined alignment and added sealed section Shellytop Road. Survey with GS 24 May 2025.
Closed
-
Updated alignment Bunya Highway and corrected classification side roads. Survey with GPS 23 May 2025.
Closed
-
REfined alignment Doonside Lane. Survey with GPS 23 May 2025.
Closed
-
Refined alignment Jimbour Station Road and added Jimbour Quarry. Survey with GPS 23 May 2025.
Closed
-
Updated selected Jimbour facilities and added detail. Survey with GPS 23 May 2025.
Closed
-
Refined alignment McAlister-Bell road, corrected name Jimbour-Cooranga North Rd and added creek crossings. Survey with GPS 23 May 2025.
Closed
-
Added Bell Transfer Station. Survey with GPS 23 May 2025.
Closed
-
Adjusted alignment sealed section of Kings Road and added Gum Tree Lane. Survey with GPS 23 May 2025.
Closed
-
Added stubs of missing roads south west of Bell and fixme for future survey. Surveyed along Bunya Highway 21 May 2025.
Closed
-
Added surface Wyreema Cambooya Rioad and side streets, Surveyed 21 May 2025.
Closed
-
Added surfaces and confirmed names (fixme resolved) Wyreema Streets. Surveyed 21 May 2025.
Closed
-
Addressed fixme (confirmed name) and added surface Siclair Street. Surveyed 21 May 2025.
Closed
-
Added wikidata and wikipedia entries to Proston Town marker
Closed
-
Added cattle grids on Niagara Road. Survey using GPS locations 10 May 2025
Closed
-
Refined alignment Kingaroy Jandowae Road, added creek crossing and side track at east end. Survey with GPS 18 May 2025.
Closed