Substation refinement
Closed
-
Fixed a few transformers, corrected a relation.
Closed
-
Substation refinement, Orange River-Collier relation
Closed
-
(no comment)
Closed
-
Added Bonita Springs substation, redrew line from Alico substation to Pine Ridge Substation. Added new relation for Fort Myers Power Station.
Closed
-
Added extensive detail to the Fort Myers plant, including the switchyards and generators.
Closed
-
Fixed Terry Substation according to new FERC data.
Closed
-
Corrected a number of electrical faults around the region, including ways that were differing voltages and not connected via a transformer. Created and labelled all substations within the region belonging to both LCEC and FPL.
Closed
-
Resolved a fixme for power system tagging, connected downtown minor lines to Fort Myers substation.
Closed
-
Added some detail to the Fort Myers Substation, showing underground cabling.
Closed
-
Added an absolute arseload of transmission lines throughout Cape Coral. Mapped several substations (Lee, Piney, Tropic Isle, Industrial, Everest, South Cape, Cape Coral, Aqualinda, Pine Island, Sanibel, Cape North) in detail.
Closed
-
Cape Coral, y u so laggy!
Closed
-
Added Calusa substation, Lee substation, Lehigh substation, and several 230kV lines north of FPL Fort Myers Generating Facility.
Closed
-
Added Alico substation and numerous lines near Estero, FL
Closed
-
Yaaay powerlines.
Closed
-
Oops. Forgot to attach a line to the power plant's substation.
Closed
-
Added power network information. Updated Hanson, Winkler and Metro substations, added transmission lines to downtown Fort Myers.
Closed
-
Added radio navigation data for RSW and I-RSW, corrected tagging on Fort Myers Tower.
Closed
-
Added data for Gulfstream Isles.
Closed
-
Added numerous power lines and substations around Southwest Florida.
Closed