2936981

Exit number is 3 from UT 179 North to I 80.

2781921 OrdinaryScarlett

New Bella Vista Bypass on-ramp from US 71 South open to traffic here.

1352936 DougPeterson

Proposed bypass lanes should be removed as they have been replaced by actual lanes.

1352935 DougPeterson

Northbound / Westbound is under construction to be completed in 2020. All traffic is carried on the Southbound / Eastbound. This should be corrected until then. Oneway appears to be enforced through the relations so it was not as simple as removing the oneway and changing highway to construction.

2643066

427 hwy extension is substantially complete, but remains closed due to a contractual dispute, per www.cbc.ca/news/canada/toronto/why-you-can-t-drive-on-this-brand-new-616m-gta-highway-1.6005609

2824042 OrdinaryScarlett

Oak Hills Drive interchange is open as of August 22, 2021.

Source:
https://www.udot.utah.gov/connect/2021/08/20/two-new-interchanges-and-a-new-connection-between-i-15-and-u-s-89-to-open/

2824041 OrdinaryScarlett

Gordon Avenue interchange is open as of August 22, 2021.

Source:
https://www.udot.utah.gov/connect/2021/08/20/two-new-interchanges-and-a-new-connection-between-i-15-and-u-s-89-to-open/

2690667 wangila123

The new highway has been open since March.

1889741 OrdinaryScarlett

Please change the name and ref of SR 265 to I 265 in Indiana and add the name and ref I 265 to the section of KY 841 between the Lewis and Clark Bridge and I 71 in Kentucky to reflect the change in designation as of June 4, 2019.

Source: https://s3.amazonaws.com/v3-app_crowdc/assets/3/31/31119030d9a75754/Final_Report_to_CHS_USRN_Application_Results_Spring_2019.original.1558475352.pdf?1558475353

1454952

Map should show under construction Kramer Junction Bypass.