-
Fix alignment of Future Sheriff King Street/6 Street SW bridge.
Closed
-
Fix tags along entire alignment of future Tsuut'ina Trail.
Closed
-
Switch traffic signals for now.
Closed
-
Add missing tag.
Closed
-
Fix construction alignment as of the time of this edit.
Closed
-
Update alignment of Highway 22X to follow temporary alignment as of this edit.
Closed
-
Alter alignment of temporary traffic shifts on Tsuut'ina Trail as of this edit.
Closed
-
Add temporary traffic signals.
Closed
-
Update alignment of Highway 8 to follow temporary alignment as of this edit.
Closed
-
Remove old road.
Closed
-
Merge streets.
Closed
-
Remove old road.
Closed
-
Fix road type, previous was correct.
Closed
-
Fix road to reflect construction.
Closed
-
Fix temporary road connection.
Closed
-
Smoothened road.
Closed
-
Smoothen ramps.
Closed
-
Smoothen ramps.
Closed
-
Smoothen roads.
Closed
-
Smooth out road alignments.
Closed