-
(no comment)
Closed
-
More work on Saint Croix River
Closed
-
Retraced Highway 35 and I-94 interchange in Hudson, WI; edited I-94 in Hudson and over the St. Croix River, fixed parts of Front Road in Hudson, WI.
Closed
-
Work on St. Croix River
Closed
-
Road cleanup and editing
Closed
-
Split Hopkins Crossroad into two lanes, traced Hopkins Crossroad and 394 exit.
Closed
-
Traced Ridgedale Dr and 394 exit, modified Ridgedale Dr
Closed
-
Retraced Plymouth Road, seperating the lanes, and traced the Plymouth Road and 394 exit
Closed
-
Retraced the 494 and 394 interchange, added the motorway links that run north and south parallel to Wayzata Blvd, edited 494 some.
Closed
-
Retraced Wayzata Blvd and Carlson Pky N exit, despite the fact that the satellite imagery is not aligned properly at the south end of the exit. Also seperated Carlson Pky N into seperate lanes.
Closed
-
Fixed polygon border between Wayzata and Orono, causing the polygon to become a road.
Closed
-
Traced link between Shoreline Dr and Wayzata Blvd
Closed
-
Work on Wayzata Blvd
Closed
-
Retraced Central Ave and Wayzata Blvd in Wayzata
Closed
-
(no comment)
Closed
-
Work on St. Croix River
Closed
-
(no comment)
Closed
-
Wayzata street cleanup, County Road 15 and Wayzata Blvd exit, Wayzata Blvd fixing
Closed
-
Created Whaletail Lake in Minnetrista.
Closed
-
Traced Long Lake and two beaches along its shoreline.
Closed