-
This street is signposted as either “Rough & Ready Rd.” or “Rough and/Ready Rd.” (on two separate signs), but never “Rough And Ready Rd.”; redrew intersections, crosswalks
Closed
-
The conference center is two distinct buildings, not a single building that happens to have a gap down the middle
Closed
-
Added wiki tags
Closed
-
This node represents the park, not the landform
Closed
-
Added addresses
Closed
-
This building hasn’t been Baldwin headquarters or showroom since around the time of my last visit there in 1998
Closed
-
Added a building
Closed
-
Detailed the Baldwin Center
Closed
-
Updated buildings
Closed
-
Bethesda Oak has been demolished; named buildings; added road name etymologies
Closed
-
Typo
Closed
-
Realigned streets; added protected bike lanes, bollards, speed bumps; moved traffic lights to stop lines; added stub sidewalks leading to crosswalks; updated stop lines
Closed
-
Disconnected stub roads per feedback in OSMUS Slack; stub is informally used as a construction vehicle parking lot anyways
Closed
-
Added wiki tags
Closed
-
Refactored I-495 route relations further into route super-duper relations; attached roadways to bridge area
Closed
-
Added traffic light
Closed
-
Added Christmas in the Park using xmas:feature tagging scheme
Closed
-
Detached Plaza de César Chávez from surrounding roads; realigned crosswalks, sidewalks; classified crosswalks; moved traffic lights to stoplines
Closed
-
This portion is normally dirt or sand rather than grass
Closed
-
Severns–Pease Christmas Display was canceled after Severns passed away in 2011; added to OpenHistoricalMap in https://www.openhistoricalmap.org/changeset/102457
Closed