-
Fruitvale BART adjustment
Closed
-
No longer called FTX field (as of a year ago)
Closed
-
Strawberry creek alignment around Berkeley campus (USGS 3DEP)
Closed
-
Bay bridge toll plaza escape track
Closed
-
Escher Creek area creek, road realignment
Closed
-
Sir Francis Drake bikeway bridge area
Closed
-
freeway retaining wall, barriers, signs
Closed
-
Toll Plaza narrowing
Closed
-
Offramp separate path
Closed
-
Bay Trail
Closed
-
Sir Francis Drake bikeway
Closed
-
Cutting Blvd and S Garrard Blvd bikeways, crossings
Closed
-
BART construction
Closed
-
Page-Kezar asphalt curb bump
Closed
-
Cruise parking lot
Closed
-
Toll plaza flexposts
Closed
-
No bikes on the toll plaza
Closed
-
Center bikeway pilot
Closed
-
16th street/caltrain sidewalks, crossings
Closed
-
Zoox and rooftop parking
Closed