OpenStreetMap logo OpenStreetMap

Changeset When Comment
156147070 over 1 year ago

Hi vas111, yes it's technically not required (except in some instances, e.g. where other transport methods do not treat the road as one way), but it doesn't do any harm. I tend to add the forward/backward tags habitually as I'm working on other items nearby, as it means I'm always applying the same standard whether it's on one or two-way roads, and with the more consistent view gat results, I'm able to more easily spot any errors I've made. This changeset wasn't specifically to add directions to traffic lights, but to ensure they were mapped on respective ways rather than on both nodes at the intersection, which results in any routing across the junction on the single carriageway "seeing" two sets of traffic lights instead of one. But I did add the directions as a by-the-by.

156144131 over 1 year ago

Hi vas111, thanks for the query.

For intersections between dual and single carriageway I work off the recommendations on the (now archived it seems) Mapbox intersection modelling page (https://web.archive.org/web/20230602212339/https://labs.mapbox.com/mapping/mapping-for-navigation/modeling-intersections-for-map-navigation/). This dictates that a split in the carriageway should not occur at the point of intersection, as it can confuse routing software and produce unpredictable results. The recommendation in this instance would be to either continue the separate ways of Market Street to the north side of the junction and join them into a single carriageway post- intersection, or alternatively have the intersection occur between a single and a dual carriageway, by combining the Market Street carriageways on the south side. I opted for the latter, as there is a natural space on the south side of the intersection for this to occur, allowing the mapped "theoretical" ways to better represent real life, versus the former.

If a further U-turn relation is required then that's not too big an issue - it is after all just a rule that will block U-turn routing from occuring. But the recommended intersection layout has a big effect on compatibility with different routing software, so I'd argue it's the more important need here. I should add though that the Aberdeen roads are mapped to a high standard, so great work if you've been involved in this 😊

155515339 over 1 year ago

Hi GinaroZ, no not specifically, apologies if I've used the wrong designation. I was going by the fact that it is used by both pedestrians and traffic traversing the same road (i.e. pedestrians are not separated onto walkways) so is a living street at least in usage/spirit, if not in legal designation. Service road seemed unlikely as it was built at the same time as nearby residential roads, with similar usage and to similar proportions - perhaps the best solution is Residential with a surface tag to denote a change from asphalt?

155262320 over 1 year ago

Hi midnight2024, I see you have altered a large section of the A92 in Arbroath to highway=construction, I assume in relation to note [4183658](note/4183658). Are you sure there is absolutely no access from one side of the town to the other, and the Guthrie Port Roundabout is entirely closed to traffic? As the changes you have made will currently stop GPS software routing road users along any of these roads. I have a hunch this needs to be mapped differently to take into account what access routes are still open on the ground, to ensure GPS road users are not affected.

118952790 over 1 year ago

Ah! Well spotted, thank you 😊 Yes I must have missed this in changeset/123379950. That road was definitely opened, I can confirm from survey (although not a recent survey). Please do remove the access restriction.

It looks like there are some minor name capitalisation issues in the adjacent ways which could be fixed at the same time, if you don't mind doing so.

118952790 over 1 year ago

Hi borovac,

That was quite a large changeset at the time, and I can't see any ways that are still mapped as closed. Which particular way/road are you referring to?

149542316 over 1 year ago

Yeah, you're right - I think I was erroneously swayed by 3D rendering, which defaults to displaying as roof:levels=1 unless otherwise specified, so was tagging relative to that. I'll change to 0.5 and add a roof:height tag.

147129646 over 1 year ago

Oh, wow! That's a failure of pretty epic proportions, especially considering the timescales. Thanks for the background info!

I've updated based on those tweeted images (and another which shows updated routing of the crossing to the NW). I've also added notes to explain why the map doesn't match what's on the ground, and that the way is "due" to be relined...

Thanks for bringing it to my attention!

147129646 almost 2 years ago

(It seems strange I know - but it reflects what is on the ground.)

147129646 almost 2 years ago

Hi, thanks for checking. Yes, it is meant to be one way - there is painted text on the cycle path at this point that says "no entry" in eastbound direction, and eastbound cyclists are forced to take the crossing. Painted lines and arrows reinforce this. Routing should direct cyclists onto the opposite carriageway.

148653388 almost 2 years ago

Ugh, forgive poor typing on a phone - "the previous routing"

148653388 almost 2 years ago

I should add, tge previous routine of the way was incorrect, and made it look more like the cycleway would have continued from Lampton Park straight through to the Great West Road - but as you'll see on updated layout, it's not the case and there is a dogleg junction instead. I think it most likely that the designated cycle route continues west to Willow Gardens and does not dogleg up this footpath, while it may have looked more likely with the old mapped layout.

148653388 almost 2 years ago

I haven't, and from your thread you've done plenty of digging in other council areas so well done! Street-level imagery shows what may be byelaw signage at the point this path meets the Great West Road, which might shed some light - but I no longer live in London so can't check. I suppose I was taking a different approach of mapping only affirmative signage, as the cycleway to the south and another on the east side of Lampton School are signed as shared cycleways, while this is not, and the omission leads me to mark this as foot designated only. Perhaps the most pragmatic option is to add a fixme tag asking someone to survey the path and check smallprint signage at North end to confirm whether bicycles are allowed?

148653388 almost 2 years ago

Apols for typos in last sentence, I mean bicycle=yes and bicycle=permissive of course.

148653388 almost 2 years ago

Thanks for the link - an interesting read (and irritating for mappers and the public, naturally! Councils' ambiguous application of signage, standards and byelaws certainly makes a mess of the situation...)

My main concern on that particular way is that it was set for cycles only with no provision for foot traffic, when the exact opposite appears to be the case on the ground. Historically it was always a footpath (hence changing to footway), and on a recent visit I saw no signage designating it for cycles. It also has a rather dangerous blind junction at the south end (incidentally with a path which *is* explicilty marked as a shared cycleway). At the north end the footpath joins with a segregated foot pavement (physically separated from the cycleway), and the path itself isn't in a park, although Lampton Park is in the vicinity.

So I think this one is a bit more clear cut to be honest? Although separately to the south, where the adjacent shared cycleway joins footways in Lampton Park, which I updated with cycle=yes (at least all those that are wide enough and have good sightlines), your method of cycle=permissive could be more appropriate.

142455607 about 2 years ago

There are issues with changing ways from under construction, to constructed with access=no and no highway classification, to fully open with full classification.

1. Some ways will go between these states in quite quick succession - OSM practice with roads (e.g. when an existing road is closed for work) is to only change closure status when that status will remain for around 3 months or more - reason being that it reduces the chances of GPS navigation software updating their maps during a period that the road is briefly in flux, and then retaining that status potentially for the following year or more.
2. There is no established threshold as to whether the road is constructed or not. Is it when the first tar goes down? When the wearing course is added? When lines are painted? How do we know there's nothing still to be constructed like barriers, or if tar needs to be lifted and relaid? IMO the only point that a road is no longer under construction is when opened to traffic. Construction traffic doesn't count, because if it did, we'd be mapping all the site traffic tracks, which would change from day to day anyway - there is no benefit to mapping what contruction traffic can use, as opposed to considering the road still under construction.
3. When other editors come to open the road, they don't necessarily know to remove or convert the access=no, proposed:ref proposed:bicycle etc into normal access/ref tags, so there is a mess of legacy tags that has to be tidied up (I've been doing some recently around N22 Macroom). But if it was left as under construction, the way can contain all of the relevant tags ready to go, so that all that remains is to convert construction tags to highway tags when the road opens.

I'd strongly advocate VictorIE's suggested way of working with road construction.

143448804 about 2 years ago

Hi Mackerski, I just spotted your edit. I had thought from expressway=* that this road met all the requirements of an expressway? Essentially that it has full access control and isn't a motorway. It's a step beyond dual carriageway (dual_carriageway=yes), due to its grade separation and lack of local exits, except for a few highway maintenance roads which are LILO.

For routing, it seems worthwhile having one or other, but expressway seems more suitable to me, or is there a different consensus on this? (I did have a hoke around the Ireland Roads wiki pages but didn't find anything.)

For another example - it's in use on the new A6 in NI: way/601375429#map=14/54.7439/-6.3959

142769638 about 2 years ago

I've reverted the change.

140702881 over 2 years ago

Hi Isaac, thanks for your edits. Unfortunately some of this is quite wrong around the Dunkettle interchange - you have reopened the roundabout and a number of roads which have long ago closed (permanently). There is recent aerial footage of what this area actually looks like now, and if you were to view on the ground you would also see the changes. You've added stretches of road which are not yet completed (see https://twitter.com/dunkettleint for current updates about the construction) and added bridges where they don't exist...

Just letting you know before I revert some of the changes you've made.

139754549 over 2 years ago

Hi MacLondon, roundabouts should be the same road designation throughout the junction - otherwise this confuses GPS routing greatly. It should be tagged with the road of highest importance that passes through it:
junction=roundabout#Selection_of_the_right_highway_tag