-
adding note
Closed
-
Adding bridge areas and embankments to the Maddox Road level crossing removal works and future alignment of the Maidstone Street bridge over the Werribee Line adjacent to the former Galvin station.
Closed
-
Adding construction areas at Maddox & Champion Roads for level crossing removal works, including construction of new culdesac at Champion Road and new Werribee Line alignment and viaduct over Maddox Road.
Closed
-
fix
Closed
-
Adding Werribee Line rail replacement bus relations
Closed
-
Adding more metro tunnel relations
Closed
-
Splitting platforms 4 and 5 at Footscray
Closed
-
Adding former Geelong Line alignment
Closed
-
Revamping Collendina Caravan Park
Closed
-
Adding Frankston - City Loop relation
Closed
-
Adding more detail around Melton station with level crossing removal construction
Closed
-
Smoothening under construction Ballarat Line approach into Melton station
Closed
-
Adding Cranbourne metro tunnel relation
Closed
-
Adding Melton level crossing removal construction areas, new track and platform layouts
Closed
-
Renaming northern group lines
Closed
-
Removing up Victoria Park relations
Closed
-
adding speedhumps
Closed
-
Changing Collendina access road tags as a living street
Closed
-
Adding name
Closed
-
Extending tags for the Bellerine Highway trunk roads into Queenscliffe town as well as adding relations for the Bellerine Railway
Closed