Rebuilding tracks and station at Brighton Beach
Adding area tags along the Flemington Racecourse Line and upgrading Newmarket station.
Updating anticipated Metro Tunnel opening date
Adding cutting tags to Metro Tunnel dive site at South Yarra.
Adding note of grade seperation.
Adding razed Beach Street level crossing in Frankston
Upgrading island platforms 1 and 2 at Camberwell
Adding area tags along the Belgrave Line from Ringwood to Boronia.
Adding Belgrave Line super express relations.
Rebuilding St Albans Secondary Collage buildings.
Adding Flinders Street => Upper Ferntree Gully relation to Belgrave Line route master
Retagging pedestrian bridge at Bayswater station as for it to appear on the map.
Adding Belgrave express relation
Adding former roads razed for Eastern Freeway construction
Adding Flemington Racecourse Line rail replacement bus relation.
Adding craigieburn replacement to route master
Adding Craigieburn Line rail replacement bus relation, modifying roads to allow for said relation.