1. Add operator=MBTA and network=MBTA for 7 missed segments of the Middleborough Main Line that the MBTA owns and operates.

    Closed
    #140612548 0 7 0 0
  2. Add operator=MBTA and network=MBTA for all of the Middleborough Main Line that the MBTA owns and operates.

    Closed
    #140612497 0 49 0 0
  3. Add operator=MBTA and network=MBTA for all of the Fitchburg Route Main Line that the MBTA owns and operates.

    Closed
    #140612331 0 122 0 0
  4. Updated the operator:passenger tags for the Needham Branch to be "MBTA" instead of "MBTA Commuter Rail". Additionally, added network=MBTA (and related network tags) to the rails to make it consistent with other branches.

    Closed
    #140612137 0 42 0 0
  5. Change operator on Boston Subdivision trackage from CP 3 to CP 45 to the MBTA. This trackage was purchased from CSX in 2012 and operations were switched to the MBTA in 2014. And additional changeset will follow to set the old operator tags.

    Closed
    #140610141 0 223 0 0
  6. Convert Weymouth Landing MBTA station platforms to areas, add ORM and GTFS tags including proper stop numbers.

    Closed
    #140608253 9 28 0 0
  7. Convert East Weymouth MBTA station platforms to areas, add ORM and GTFS tags including proper stop numbers.

    Closed
    #140607337 9 43 0 0
  8. Convert West Hingham MBTA station platforms to areas, add ORM and GTFS tags including proper stop numbers.

    Closed
    #140607105 8 12 1 0
  9. Convert Nantasket Junction MBTA station platforms to areas, add ORM and GTFS tags including proper stop numbers.

    Closed
    #140606833 6 9 0 0
  10. Add ORM and GTFS tags to Greenbush MBTA station including proper stop numbers. Additionally added some more foot paths and sidewalks for better walking directions.

    Closed
    #140606573 10 8 0 0
  11. Define track numbers and correct names/ownerships on some Greenbush Branch tracks

    Closed
    #140606285 0 45 0 0
  12. Renamed Greenbush Branch rail tracks to match OSM naming rules instead of reflecting their description in places. Additionally added operator tags to all of the main rails.

    Closed
    #140604767 0 45 0 0
  13. Add ORM and GTFS tags to Readville MBTA station including proper stop numbers.

    Closed
    #140603907 0 12 0 0
  14. Convert Fairmount MBTA station platforms to areas, add ORM and GTFS tags including proper stop numbers.

    Closed
    #140603570 20 16 0 0
  15. Removed duplicate station point (station area also exists) for Blue Hill Avenue MBTA station. Update tags to reflect GTFS attributes.

    Closed
    #140603296 0 5 1 0
  16. Convert Morton Street MBTA station platforms to areas, add ORM and GTFS tags including proper stop numbers.

    Closed
    #140602897 12 21 0 0
  17. Add ORM and GTFS tags to Talbot Avenue MBTA station including proper stop numbers.

    Closed
    #140598712 0 8 24 0
  18. Add ORM and GTFS tags to Four Corners/Geneva MBTA station including proper stop numbers.

    Closed
    #140598379 13 14 0 0
  19. Add ORM and GTFS tags to Uphams Corner MBTA station including proper stop numbers.

    Closed
    #140597895 0 8 0 0
  20. Convert Newmarket MBTA station platforms to areas, add ORM and GTFS tags including proper stop numbers.

    Closed
    #140597549 6 10 0 0