1. Set route colors for SL4/SL5 routes

    Closed
    #141169784 0 5 0 0
  2. Fix ordering of ways in SL1 route at Terminal C

    Closed
    #141169695 0 1 0 0
  3. Fix ordering of SL2 inbound to correct gap at loop

    Closed
    #141169636 0 1 0 0
  4. Split SL5 into inbound/outbound routes

    Closed
    #141169569 1 2 0 0
  5. Upgrade MBTA CR-Lowell to PTv2

    Closed
    #141168786 0 2 0 0
  6. Re-tag Harvard Bus Tunnel as a busway operated by the MBTA

    Closed
    #141139820 0 9 0 0
  7. Convert platforms at Harvard to areas

    Closed
    #141139780 11 18 0 0
  8. Add subway platforms at Central

    Closed
    #141139685 10 4 0 0
  9. Convert platforms at Charles/MGH to areas

    Closed
    #141139244 7 18 2 0
  10. Add subway platforms at Broadway

    Closed
    #141139101 5 4 1 2
  11. Add subway platforms at Ashmont

    Closed
    #141139012 10 5 0 0
  12. Paths around Wedgemere

    Closed
    #141137460 2 8 0 0
  13. Add alternate Lowell Line platform at North Station

    Closed
    #141137303 0 1 0 0
  14. Reordered ways for MBTA Lowell Line outbound

    Closed
    #141137224 0 1 0 0
  15. Split MBTA Lowell Commuter Rail line into inbound/ouitbound routes

    Closed
    #141136513 1 2 0 0
  16. Set operator=MBTA on Columbus Avenue busway

    Closed
    #141133226 0 8 0 0
  17. Add bus stopping locations for Aberdeen Ave and Watertown Square Terminal

    Closed
    #141132065 2 8 0 0
  18. Add colors to SL1/SL2/SL3 routes and route masters

    Closed
    #141131580 0 10 0 0
  19. Add stopping locations for Logan terminals and add/reorder within SL1 inbound route

    Closed
    #141131376 9 25 0 0
  20. Split ways to align with stop positions on SLW/SL2 routes

    Closed
    #141130553 7 15 0 0