1. Per http://brucetrail.org/trail_changes/242: At the request of a landowner, the main Trail has been rerouted from its previous location up Cedar Springs Rd and through the Highview Survey. New Route = 855 metres Closed Trail = 1 km

    Closed
    #47104013 0 0 52 0