-
Removed shop names, changed footpath access, removed gate numbers, closed Terminal
Closed
-
Changed multiple shops/restaurants as disused (building closing)
Closed
-
Updated construction area - created neighborhood within Thurgood Marshall College
Closed
-
Marked San Diego International Airport's new Terminal 1 as no longer under construction. Changed the name to reflect it's formal name.
Closed
-
Added footpaths to terminal 1 parking structure
Closed
-
added Building Height
Closed
-
Added last entrance
Closed
-
Updated entrances
Closed
-
Fixed pathways/elevators
Closed
-
Added elevators, multiple exit paths/gates
Closed
-
Updated construction area/road under construction
Closed
-
Added shops and restaurants to new Terminal 1 building
Closed
-
Updated escalators and steps; added airline ticket counters
Closed
-
Updated terminal address; aircraft apron; deleted old address
Closed
-
Removed construction area boundary away from the new Terminal 1. Renamed costruction area to Terminal 1 Expansion; Removed construction fencing within aircraft apron, added new construction area to the east.
Closed
-
Fixed fencing locations
Closed
-
Removed aircraft parking positions (no longer exist)
Closed
-
Updated airport apron to connect with the New Terminal 1 building.
Closed
-
Added features to New Terminal 1
Closed
-
Updated indoor walkways at New Terminal 1 based on surveys
Closed