Fixes around Austin Bagget Park
Starting to fill in landscaping.
More tweaks of roads and active transportation around Downtown
Path to Bike trailhead is understood bike-ped not just ped. Also fixed parking lot.
Fixed 8th & I Street Intersection crossings on signal and bike lane connected to sidepath
The crossing and route to bicycle parking is both pick and pedestrian.
Fixing more lights and crossings along 8th Street
Downtown trail fixes and Main St
Updates around Hwy-102 from Bright Road to I St
Aligning trail based on recent Aerial Imagery
Changing crossings back to traffic light based
Fixing Bike lane sides and connectivity for proper directional routing.
Updates around Walton & 12th/Tiger updates
Changed crossing to be marked and with traffic signal
Aligning and updating along 8th Street and Water Tower Rd
Making crossing's with traffic signal again
Biking through campus is not preferred, but around the perimeter is very much bike-ped friendly