-
Survey opening hours
Closed
-
Survey toilet availabilities
Closed
-
Survey opening hours
Closed
-
Add parking details to Bukit Gombak Shopping Center
Closed
-
Add cycle barriers, add crossings, add bridge under construction.
Closed
-
Vehicle inspection building is not accessible to the general public
Closed
-
Fix relation and pedestrian crossing
Closed
-
Jurong West Park Connector under construction for JRL; reflecting new cycle route realities (e.g. dismount signs, steep slopes, bad smoothness).
Closed
-
Fix pedestrian crossing and footpath to match IRL
Closed
-
Add pedestrian crossing and footpath in middle where cycle path disappears. REVIEW: The footpath ways are... ambiguous. By law it is probably not a cycle path, since it is not marked. But it is wide enough (around 3m) that it *feels* like a shared path.
Closed
-
Fix bollard -> cycle barrier
Closed
-
Add cycling-related restrictions outside Jurong Point
Closed
-
Add bike parking at Pioneer MRT exit A
Closed
-
Improve Jurong West PCN near Pioneer MRT (situation is complicated on the ground... cycling paths interspersed with footpaths parallel to dismount-paths... sigh)
Closed
-
Improve footpaths around Bukit Gombak Shopping Centre
Closed
-
NTU parking lot is free for motorcycles only
Closed
-
Not a bus stop, just a shelter
Closed
-
Update surface and smoothness of rail corridor bridge
Closed
-
Change cycle paths to footpaths and crossings for Ulu Pandan PCN to better reflect reality
Closed
-
Fix CCK PCN and some parts of Bukit Batok West and East PCN
Closed