1. Remove non-existent cycleway towards Jurong Town Hall Road; users are expected to use bridge

    Closed
    #164524831 0 1 0 0
  2. Mark non-cycleable footpath (no markings, too narrow)

    Closed
    #164524710 2 1 0 0
  3. Add Lakeside MRT cycle link

    Closed
    #164524617 0 1 0 0
  4. Fix crossings

    Closed
    #164524592 1 5 0 0
  5. Fix connection from Lakeside Drive to Park Connector

    Closed
    #164524501 3 9 3 0
  6. Remove PCN relation from footpaths

    Closed
    #164524391 0 1 0 0
  7. Fix incorrect cycle path for Jurong Park Connector; there is no direct connection across Jalan Boon Lay; you need to use the roads or footpaths

    Closed
    #164524353 4 4 0 0
  8. Fix up Jurong West Park Connector crossings

    Closed
    #164524263 6 29 2 0
  9. Add a kerb barrier on footpath connecting to CCK North 6; not wheelchair accessible for crossing the road.

    Closed
    #164523412 1 1 0 0
  10. Change cycle paths to pedestrian crossings at CCK North 5 and CCK Drive intersection.

    Closed
    #164523261 2 2 0 0
  11. Fix up cycle paths on CCK Drive bridge over KJE (bridge itself is not cycle-able IRL and is just a normal bridge-footpath)

    Closed
    #164523154 3 6 0 0
  12. Remove non-existent PCN on CCK Ave 3

    Closed
    #164522931 5 3 0 0
  13. Fix up cycle paths near Jurong River

    Closed
    #164517570 5 18 0 0
  14. Add shared cycling path near Yew Tee MRT

    Closed
    #164514679 2 6 0 0
  15. Note that cemetery paths are unlit; to stop cycling apps from sending cyclists down this creepy and dangerous path at night

    Closed
    #164514452 0 11 0 0
  16. Remove bicycle = yes tag, since this is just a regular footpath and not all bikes can use it

    Closed
    #164489331 0 1 0 0
  17. Add new cycle route on Pioneer Road North

    Closed
    #164489257 1 2 0 0
  18. Add new cycle route on Jurong West Street 91

    Closed
    #164489238 2 4 0 0
  19. Add new cycle route on Jurong West Ave 5

    Closed
    #164489146 1 1 0 0
  20. Jurong West Park Connector has critical paths under construction, mostly for the Jurong Regional Line and a bridge across a canal.

    Closed
    #162886513 3 5 0 0