-
Correction of voltage and improper mapping of 500kV bypassing Charni Yar 220kV SS
Closed
-
.
Closed
-
.
Closed
-
.
Closed
-
.
Closed
-
removal of $150 million in SS equipment that should not be on the OSM.
Closed
-
removal of misidentified transformers & power features at Lutsk SS
Closed
-
removal of misidentified transformers at Rivne & Hrabiv SS
Closed
-
cleanup of Rivne NPP, removal of misidentified power features listed as transformers
Closed
-
.
Closed
-
added transformers at Kuchurgan SS, landed circuits, cleanup minor mapping issues.
Closed
-
removal of misidentified "auto" transformers. correction of 330/110kV pairs that land at 220kV yard.
Closed
-
Correction of line voltages at Kuchurgan PP & SS, addition of 3 switchgear per voltage at SS
Closed
-
Rerouting of circuits connecting to Russia at 49.967552°, 36.520240° (fix me request) cannot be verified from satellite images. Uncertain if physical work completed prior to Feb 24. Belgorad & Shebekino circuits would be combined, to Valuyki left dead.
Closed
-
Correction of Chernobyl 750kV line partially decommissioned and disconnected from Khmelnitsky NPP 750 TS - Kyivska TS - 750kV
Closed
-
Correction of voltage/mapping errors at SUNPP. Additional unnecessary clutter & errors left inside 330kV switchyard
Closed
-
SS decommissioned or/and future proposal with no ground broke prior to February 2022.
Closed
-
Addition of functional features to Varna 750 operating at 400kV with Varna-Isaccea 750kV build operating and landed as 400kV.
Closed
-
Addition of functional features to Isaccea-750 SS operating as 400kV Switchyard with 750kV line to Moldova/Ukraine decommissioned and 750kV build Isaccea-Varna operating at 400kV.
Closed
-
Removal of voltage from decommissioned Isaccea-Kuchurgan 750kV, addition of note/description to segments. This circuit is often quoted in the media as operational due to surface only investigations of grid resources and visibility on OSM.
Closed