1. Correction of voltage and improper mapping of 500kV bypassing Charni Yar 220kV SS

    Closed
    #131929211 0 5 4 0
  2. .

    Closed
    #131928107 0 5 36 1
  3. .

    Closed
    #131904938 0 3 20 0
  4. .

    Closed
    #131904335 0 6 9 0
  5. .

    Closed
    #131904080 0 0 2 0
  6. removal of $150 million in SS equipment that should not be on the OSM.

    Closed
    #131903506 0 0 15 0
  7. removal of misidentified transformers & power features at Lutsk SS

    Closed
    #131903335 0 0 18 0
  8. removal of misidentified transformers at Rivne & Hrabiv SS

    Closed
    #131903202 0 0 12 0
  9. cleanup of Rivne NPP, removal of misidentified power features listed as transformers

    Closed
    #131903051 6 6 15 0
  10. .

    Closed
    #131902895 0 1 0 0
  11. added transformers at Kuchurgan SS, landed circuits, cleanup minor mapping issues.

    Closed
    #131902723 10 7 6 0
  12. removal of misidentified "auto" transformers. correction of 330/110kV pairs that land at 220kV yard.

    Closed
    #131902475 0 3 11 0
  13. Correction of line voltages at Kuchurgan PP & SS, addition of 3 switchgear per voltage at SS

    Closed
    #131902262 33 7 0 0
  14. Rerouting of circuits connecting to Russia at 49.967552°, 36.520240° (fix me request) cannot be verified from satellite images. Uncertain if physical work completed prior to Feb 24. Belgorad & Shebekino circuits would be combined, to Valuyki left dead.

    Closed
    #131891198 3 4 4 0
  15. Correction of Chernobyl 750kV line partially decommissioned and disconnected from Khmelnitsky NPP 750 TS - Kyivska TS - 750kV

    Closed
    #131889952 1 2 3 0
  16. Correction of voltage/mapping errors at SUNPP. Additional unnecessary clutter & errors left inside 330kV switchyard

    Closed
    #131889498 6 20 22 0
  17. SS decommissioned or/and future proposal with no ground broke prior to February 2022.

    Closed
    #131888947 0 1 0 0
  18. Addition of functional features to Varna 750 operating at 400kV with Varna-Isaccea 750kV build operating and landed as 400kV.

    Closed
    #131888574 10 1 0 0
  19. Addition of functional features to Isaccea-750 SS operating as 400kV Switchyard with 750kV line to Moldova/Ukraine decommissioned and 750kV build Isaccea-Varna operating at 400kV.

    Closed
    #131888269 18 1 0 0
  20. Removal of voltage from decommissioned Isaccea-Kuchurgan 750kV, addition of note/description to segments. This circuit is often quoted in the media as operational due to surface only investigations of grid resources and visibility on OSM.

    Closed
    #131887783 0 6 0 0