-
add powerline
Closed
-
substation detail
Closed
-
estimated route of buried 161kv cable from Ramla/Nesher replacing previous overhead route
Closed
-
substation refinement
Closed
-
add substation detail
Closed
-
fix construction tags
Closed
-
grid fixes
Closed
-
add southern segment of under construction 400kv line, including new - yet to be connected - pylons
Closed
-
add buildings
Closed
-
city touch up
Closed
-
Specify fire hydrant positions
Closed
-
Specify fire hydrant types
Closed
-
Survey small map features
Closed
-
Specify whether pedestrian crossings have islands
Closed
-
Specify access to playgrounds
Closed
-
Specify whether pedestrian crossings have markings
Closed
-
Determine the heights of kerbs
Closed
-
Specify step counts
Closed
-
Specify whether steps have a ramp
Closed
-
Specify drinking water types
Closed