Gerlcad's Notes
Notes submitted or commented on by Gerlcad
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 4531925 | Gerlcad | The Van Buren two-way PBL is almost done between Kilbourn and Wells. It’s striped and they’ve added concrete. All that’s left is for them to clean it, paint the concrete, and add flexi-posts. It should be done within 2 weeks. |
|||
| 4435248 | Gerlcad | This project is beginning on Monday. It’ll extend the PBLs almost to Humboldt. Here is the page: https://engage.milwaukee.gov/north . The design and schedule is on there, so something to look out for. |
|||
| 4317950 | Gerlcad | There’s a protected bike lane on the north side of the street between Van Buren and Jackson. The south side will be completed later this year. |
|||
| 4444843 | Gerlcad | Phase 2 of the Powerline Trail is now open |
|||
| 4317308 | BPTT | This slip lane is closed and will soon be removed. It has bus route relations that will need to be updated, and adjacent landuse features as well. |
|||
| 4416859 | Gerlcad | Oh stead way has buffered bike lanes. And the path adjacent is wide enough to be a multi-use trail |
|||
| 4360713 | Gerlcad | The fountain got torn out |
|||
| 4360710 | Gerlcad | The protected bike lane on the western part of the street starts at the intersection with Canal |
|||
| 4360709 | Gerlcad | The trail here no longer exists and is completely brush |
|||
| 4317951 | Gerlcad | There is a protected intersection here. I don’t see why the protected bike lane says it ends at the intersection for any direction. |