Fix messed up 22kV lines at Finså power station. Update landcover around Ertsmyra substation and some minor power tagging updates.
Closed
-
Update details at Rendalen power plant and substation
Closed
-
Update power lines east of Minnesund. 66kV from Nord-Odal has been upgraded to Engerfjellet in preparation of new wind farm.
Closed
-
Update operator of 132kV Minne-Skarnes-Kongsvinger-Eidskog-Swedish border. Transmission lines can only be operated by TSO, so ownership was transferred from Elvia to Statnett.
Closed
-
Fix someone changing tower to pole on Kvænangen-Skillemoen 132kV lines
Closed
-
Add/update 420kV Balsfjord-Skillemoen that is now active.
Closed
-
Add new power line under construction Skillemoen (Alta) to Skaidi. Update some old lines.
Closed
-
Fix road class on fv258 Strynefjellsvegen. Its not signed and a very low quality road.
Closed
-
Removing toll point Skorgen that was part of E136 Tresfjordbrua toll
Closed
-
Removed toll tag on fv2522 Kongsvegen.
Closed
-
Removed toll point Skarsmoen. Collection ended at noon on 18. January 2021
Closed
-
Add some tags to power cables in Bodø
Closed
-
Some small power tower tag fixes on Varanger peninsula
Closed
-
Adjust Haraheia com mast and add road
Closed
-
Update Hofstad substation, update line operator names, add power line from Sørmarksfjellet and adjusted some turbine positions in Roan windpark.
Closed
-
Stjørdal: Fixing poor landcover and other details along Stjørdalselva
Closed
-
Stjørdal: Fixing poor landcover and other details along Stjørdalselva
Closed
-
Stjørdal: Fixing poor landcover and other details along Stjørdalselva
Closed
-
Stjørdal: Fixing poor landcover and other details along Stjørdalselva
Closed
-
Stjørdal: Fixing poor landcover and other details along Stjørdalselva
Closed