-
link
Closed
-
7
Closed
-
minor fixes
Closed
-
why are these trunk?
Closed
-
Why only this part trunk
Closed
-
classes
Closed
-
878
Closed
-
tunnel doesnt even meet the speed limit requirements for it to be designated as a motorway, among other things.
Closed
-
terminus
Closed
-
corrected some ramps incorrectly marked as a proper motorway
Closed
-
most of this parkway easily exceeds motorway standards
Closed
-
classifications
Closed
-
classificaiotns
Closed
-
terminus
Closed
-
terminus
Closed
-
not a freeway
Closed
-
continuity
Closed
-
updated tags
Closed
-
terminus
Closed
-
class
Closed