-
adjusted the 210/Livingston Rd interchange post construction with imagery. added bike path connections. added foot/crossings
Closed
-
updated parking lot roads mainly after a drive through survey
Closed
-
Updated a hotel and a restaurant
Closed
-
Updated a counselling
Closed
-
Specify road surfaces
Closed
-
Specify fire hydrant positions
Closed
-
Specify fire hydrant types
Closed
-
Add node
Closed
-
Specify whether traffic signals have tactile indications that it's safe to cross
Closed
-
Specify whether traffic signals have a button for pedestrians
Closed
-
Specify whether traffic signals have sound signals
Closed
-
Edit element
Closed
-
Specify roof colour
Closed
-
Specify whether ways are lit
Closed
-
Specify whether roads have sidewalks
Closed
-
Specify whether crosswalks have tactile paving
Closed
-
Specify whether there are crossings at intersections of paths and roads
Closed
-
Determine whether building construction is now completed
Closed
-
Specify building colour
Closed
-
added details from site survey today. Walmart is fully closed and police will respond to trespassing on the site. No trucks at BJs
Closed