-
Drove through the street to notice that bikes are shared on the road.
Closed
-
Updated Centennial Park
Closed
-
Added some features to the Wonderland Train Station and Parking Lot
Closed
-
Visited the Elizabeth Doris Memorial Park on the Revere Beach Reservation and decided to update the area. This reservation will have changes in the next couple of years.
Closed
-
Removed these 2 buildings as they were torn down to make way for new construction.
Closed
-
Made Bellingham St into a bridge as it goes over the Chelsea Greenway and new Silver Line road.
Closed
-
Updated the area to best reflect the rest of the Central Wharf area, including adding stairs and ramps where it is appropriate, adding benches and lights to the back, fixing Water Taxi dock.
Closed
-
Added the stairways between Lafayette and Franklin, placed some bus stops in it's appropriate location, and added benches to Malone Park.
Closed
-
Walked around the area to notice the new Chelsea Greenway has a path from Griffin Way to Box District Station and from Library St. Added the paths before they publicly open within a month
Closed
-
Added this missing building.
Closed
-
Updated several buildings and pathways in the area
Closed
-
Not sure if both sides of Broadway have bike lanes but the left side does.
Closed
-
Minor edit to bike access on Meridian
Closed
-
Added more details to the area, including adding to the Boston Harborwalk
Closed
-
Adding this segment's bike access
Closed
-
Added the service road for the Chelsea Yacht Club.
Closed
-
Adding the Boston Harborwalk. When construction is done, the Boston Harborwalk at each location should connect with each other.
Closed
-
Shortened the Lewis Mall area to it's current size. It may need to be extended when construction on Clippership Wharf is complete.
Closed
-
Although it looks like 1 building on the Sat Image, it's actually 2 buildings.
Closed
-
Added these new buildings that are nearly complete. It will need to be readjusted when good quality sat imagery gets updated.
Closed