-
Added bike parking.
Created
-
Added bike parking to this shoppers/Canada post. Finally.
Closed
-
Added the new urban square to Oshawa's downtown.
Closed
-
added bike parking to various spots around this new plaza
Closed
-
Added new bike rack. Great placement, but the rack doesn't allow "adult-sized" wheels to fit, which is a shame. Locking an adult bike can be achieved from the sides of the rack, but won't support the full frame.
Closed
-
Added public washroom and bike parking. Will need to be refined when an updated satellite layer becomes available. I used GPS from my phone to plot these points.
Closed
-
Added bike lanes to Greenhill ave.
Closed
-
added bike repair stand and bottle refill station
Closed
-
added bike rack
Closed
-
removed bike shop. Retail shop closed down.
Closed
-
extended walkway for newly added section. This connects to sidewalks, which will still need to be added.
Closed
-
added bike parking
Closed
-
realigned new section of the waterfront trail bordering Whitby and Oshawa. Old trail sections have been removed and new sections, including the new bridge, has been added.
Closed
-
Deleted semi-detatched buildings and replaced them with detatched buildings.
Closed
-
Changed one-way on Colborne and Brock to two-way per recent city road modification.
Closed
-
Lowered speed from 80km/h to 60km/h and added speeds where missing. Navigation apps like Magic Earth erroneously gave incorrect speed limits!
Closed
-
added new MUP and crossrides. It will extend further west, but past the western point that I've added is just currently a rocky mess and not paved.
Closed
-
Added road name and bike parking
Closed
-
added bike parking
Closed
-
added address
Closed