This footway appears to be rather unpopular based on usage heat maps.
This gate was (permanently?) locked.
These paths have lowered curbs, which makes them suitable for bicycles, wheelchairs and strollers.
The bike shop didn't last here. Space is now being renovated.
Minor updates around Chalkfarm PS.
I saw no signs of a path here today. I can't see it in a cycling heatmap either.
Fixed pedestrian path connecting Humber River Rec Trail and Lawrence Ave.
This pedestrian bridge connects to this parking lot.
These curbs are lowered. Not worth even including them in the map, IMO.
Brickworks contains a network of multiuse pathways that are very well suited for bicycles.
Improved tracing of Hungtinton Trail
Huntington Trail pedestrian bridge still under construction.
Updated tracing of Bartley Smith Greenway based on today's survey and GPS trace.
This portion of the Don Trail is no longer under construction.
Tweaked cycling infrastructure around the intersection of Leslie St and HWY 7
Tweaks to pedestrian infrastructure around the intersection of Allstate Pkwy and HWY 7