-
Added sharrows around Kingston Rd and The Toronto Hunt golf course.
Closed
-
Retraced informal path based on cycling heatmap
Closed
-
Updated informal path off East Don Parkland Trail based on cycling heatmap.
Closed
-
Minor updates to Huntington Trail based on cycling heatmap.
Closed
-
Added popular cycling shortcut behind George Bailey Building based on Strava heatmap
Closed
-
Updated path hidden by trees using cycling heatmap.
Closed
-
Added missing traffic lights.
Closed
-
This pedestrian crossing is still not operational, but there are now signs on the road warning drivers about the new traffic lights, so I expect that they will go online real soon now.
Closed
-
A small portion of the Black Creek Trail south of Finch is under construction. A posted sign shows an expected opening date of October 2024.
Closed
-
Added fire pit by Don Trail. It looked well loved.
Closed
-
I spoke today briefly with a surveyor that was working on the path around Eglinton and the Don Trail. He said that the path will likely open some time in Spring or Summer at the latest. I could see they had a ton of saplings ready to be planted.
Closed
-
Minor tweaks around Don Mills Trail as it follows Leslie.
Closed
-
Improved pedestrian crossings at Doris Ave @ Greenfield Ave.
Closed
-
Added fairly recent pedestrian crossover along Greenfield Ave. There's also a traffic calming flexipost, which OSM doesn't currently have a great way of tagging.
Closed
-
It's a foot path, not a sidewalk, because it is not on the side of a road.
Closed
-
Added path around R J Lang School.
Closed
-
Added splash park on Henlon Park.
Closed
-
Added a few townhouses around Eldora Ave.
Closed
-
Added MTB tags to Portage segment.
Closed
-
Part of the sidewalk along Dudley ave is made of asphalt, which is unusual.
Closed