1. change the layer from the crosswalk on the bridge to 1

    Closed
    #175752126 0 1 0 0
  2. change the layer from the footway on the bridge to 1

    Closed
    #175751790 0 1 0 0
  3. deleted the footway after construction

    Closed
    #175751300 3 0 17 0
  4. change the layer from the footway on the bridge to 1

    Closed
    #175749238 1 7 0 0
  5. Bus stopping edge "Ersatz" added

    Closed
    #173836388 1 0 0 0
  6. After completion of the construction work, the bus stops are located directly in front of the station.

    Closed
    #173826629 0 0 3 0
  7. change position from the bus stop and uic_ref

    Closed
    #173224586 1 2 0 0
  8. Bus stop was renamed from Allmendstrasse to Allmend. (in 2014)

    Closed
    #172775623 0 2 0 0
  9. bus stop name changed to Allmend Bahnhof because the train station is already named Solothurn Allmend.

    Closed
    #172775580 0 2 0 0
  10. Bus stop was renamed from Allmendstrasse to Allmend. (in 2014)

    Closed
    #172775494 0 2 0 0
  11. added bus stop for railreplacement bus EV

    Closed
    #172434923 1 0 0 0
  12. added uic_ref, uic_name and line EV

    Closed
    #172298973 0 1 1 0
  13. added bus stop for railreplacement bus

    Closed
    #172298371 1 0 0 0
  14. change position of the waiting area from the bus stop after constructionswork

    Closed
    #172290980 0 6 9 0
  15. Deleted Level 0 for connectivity to stairs

    Closed
    #172104048 0 3 0 0
  16. deleted level 0

    Closed
    #172103563 0 1 0 0
  17. added footway

    Closed
    #172098283 2 0 0 0
  18. end of construction work

    Closed
    #171119228 0 1 0 0
  19. back to access = private, added tag foot = yes

    Closed
    #171030595 0 1 0 0
  20. Parking non-private, Shuttlebus Terminal during ESAF 2025

    Closed
    #170974687 0 1 0 0