80634132 almost 6 years ago

You may have overlooked the Alabang -> Iloilo City bus route upon upload, and it gets cut already in Mindoro Island part. Kindly complete the route immediately.

80504523 almost 6 years ago

You might forgot the conditional one-way scheme during weekends and holidays, and it has to be updated right away. Thanks!

78809071 almost 6 years ago

Unfortunately, the insider source for Manila MRT Line 3 and Bus stop (upon survey) will now follow the standardisation suit for Boni/Pioneer since the MRT management have changed the signages inside the platform that says, "Boni/Pioneer". Hopefully, this will help you a lot.

Tip: You may take note of the station names within the platform via smartphone, then revise if necessary.

80256367 almost 6 years ago

That's sad to hear that most people are not yet ready for the RNS (even there is a news and posted signage already), but will reduce into city/town or transport terminal names on the further revision.

79275137 almost 6 years ago

Signages could override the default speed limits, especially on the Ilocos Region upon on-site/vehicular survey wherein the downtown speed limits are reduced into 30 km/h while the curved sections, bridges, and straight through sections with habitations or businesses within the highway are reduced to 50-60 km/h for safety reasons. Any rural straight through sections could safely set to 80 km/h if there are no roadside habitations or businesses.

80307378 almost 6 years ago

ADDENDUM: This includes Inter-island (Surigao) Bus route enhancement

79232791 almost 6 years ago

Kindly be informed that several relation routes (mostly bus routes) are altered in a way that it needs immediate and expeditious reversion via JOSM.

79005275 almost 6 years ago

This includes recalibration of all bus routes via Dasmarinas City upon request from @TagaSanPedroAko. This changeset may subject to change from time to time without any notice.

76639961 about 6 years ago

For best results, JOSM is a must-use along with the lifecycle "construction:highway=*" tags. Lifecycle tags will prevent premature rendering compared to "highway=construction" and "construction=*" tags.

76783623 about 6 years ago

Various erratum made by DEARPAUL24 due to mis-tagged one-way on the following changeset links: changeset/76785561 and changeset/76809660

76440012 about 6 years ago

Notes: This includes the "construction:highway=*" tags that are being implemented to prevent any premature rendering while the Cavite Segment construction is about to begin.

75144204 about 6 years ago

Apologies for erratic tags, and will fix in a bit. It usually happens on my end that there's erratic input.

72888363 over 6 years ago

Apologies for late response, but it is basically a 'covered' part and not a tunnel (as per explanation to prevent confusion) where some parts of at-grade (after Skyway Entry Ramp to Sucat Interchange) are prone to GPS signal disruptions.

72880344 over 6 years ago

Note: This changeset have enabled the "covered" tag where the E6/NAIAX may cover the parts of PH-192, and it would determine the possible GPS signal loss on at-grade in comparison to the excellent GPS signal at the elevated E6/NAIAX.

72550061 over 6 years ago

Unfortunately, Line 2 is still a heavy rail/subway specifications (similar to East Asian and ASEAN MRT counterpart) where the metro system is used, and according to sources, the words "Metro Manila Strategic Mass Rail Transit Development (Line 2) Project" and "LRTA-Line 2" are seen in the PH-JP ODA Plaque throughout the Line 2 stations.

72834685 over 6 years ago

Note from DEARPAUL24 from the Philippines: You have fixed the incorrect tag, but the scope of the edit may involve multiple countries. Hopefully, you will separate the edits in one country - one changeset at a time. It may bother other editors on some countries where stringent editing rules are applied.

72330197 over 6 years ago

You might have overlooked the three (3) Bus Route relations where the edit got inadvertent damage. Kindly correct it immediately on the subsequent edit.

68633965 over 6 years ago

Hello, Schadow1Expeditions. Is the one-way scheme 24/7 daily?

63723916 over 6 years ago

Now reverted already to reality: changeset/70603419

63723916 over 6 years ago

It's indeed negative on the ground (due to no road board information from DPWH), and besides, only Idesia Dasmarinas is really on the ground (under construction). Anyways, thank you for your feedback.

P.S. Negative also on DepED R4A (CALABARZON)|Cavite|Dasmarinas City Elementary Schools Master List