DP24PH's Comments
| Changeset | When | Comment |
|---|---|---|
| 80634132 | almost 6 years ago | You may have overlooked the Alabang -> Iloilo City bus route upon upload, and it gets cut already in Mindoro Island part. Kindly complete the route immediately. |
| 80504523 | almost 6 years ago | You might forgot the conditional one-way scheme during weekends and holidays, and it has to be updated right away. Thanks! |
| 78809071 | almost 6 years ago | Unfortunately, the insider source for Manila MRT Line 3 and Bus stop (upon survey) will now follow the standardisation suit for Boni/Pioneer since the MRT management have changed the signages inside the platform that says, "Boni/Pioneer". Hopefully, this will help you a lot. Tip: You may take note of the station names within the platform via smartphone, then revise if necessary. |
| 80256367 | almost 6 years ago | That's sad to hear that most people are not yet ready for the RNS (even there is a news and posted signage already), but will reduce into city/town or transport terminal names on the further revision. |
| 79275137 | almost 6 years ago | Signages could override the default speed limits, especially on the Ilocos Region upon on-site/vehicular survey wherein the downtown speed limits are reduced into 30 km/h while the curved sections, bridges, and straight through sections with habitations or businesses within the highway are reduced to 50-60 km/h for safety reasons. Any rural straight through sections could safely set to 80 km/h if there are no roadside habitations or businesses. |
| 80307378 | almost 6 years ago | ADDENDUM: This includes Inter-island (Surigao) Bus route enhancement |
| 79232791 | almost 6 years ago | Kindly be informed that several relation routes (mostly bus routes) are altered in a way that it needs immediate and expeditious reversion via JOSM. |
| 79005275 | almost 6 years ago | This includes recalibration of all bus routes via Dasmarinas City upon request from @TagaSanPedroAko. This changeset may subject to change from time to time without any notice. |
| 76639961 | about 6 years ago | For best results, JOSM is a must-use along with the lifecycle "construction:highway=*" tags. Lifecycle tags will prevent premature rendering compared to "highway=construction" and "construction=*" tags. |
| 76783623 | about 6 years ago | Various erratum made by DEARPAUL24 due to mis-tagged one-way on the following changeset links: changeset/76785561 and changeset/76809660 |
| 76440012 | about 6 years ago | Notes: This includes the "construction:highway=*" tags that are being implemented to prevent any premature rendering while the Cavite Segment construction is about to begin. |
| 75144204 | about 6 years ago | Apologies for erratic tags, and will fix in a bit. It usually happens on my end that there's erratic input. |
| 72888363 | over 6 years ago | Apologies for late response, but it is basically a 'covered' part and not a tunnel (as per explanation to prevent confusion) where some parts of at-grade (after Skyway Entry Ramp to Sucat Interchange) are prone to GPS signal disruptions. |
| 72880344 | over 6 years ago | Note: This changeset have enabled the "covered" tag where the E6/NAIAX may cover the parts of PH-192, and it would determine the possible GPS signal loss on at-grade in comparison to the excellent GPS signal at the elevated E6/NAIAX. |
| 72550061 | over 6 years ago | Unfortunately, Line 2 is still a heavy rail/subway specifications (similar to East Asian and ASEAN MRT counterpart) where the metro system is used, and according to sources, the words "Metro Manila Strategic Mass Rail Transit Development (Line 2) Project" and "LRTA-Line 2" are seen in the PH-JP ODA Plaque throughout the Line 2 stations. |
| 72834685 | over 6 years ago | Note from DEARPAUL24 from the Philippines: You have fixed the incorrect tag, but the scope of the edit may involve multiple countries. Hopefully, you will separate the edits in one country - one changeset at a time. It may bother other editors on some countries where stringent editing rules are applied. |
| 72330197 | over 6 years ago | You might have overlooked the three (3) Bus Route relations where the edit got inadvertent damage. Kindly correct it immediately on the subsequent edit. |
| 68633965 | over 6 years ago | Hello, Schadow1Expeditions. Is the one-way scheme 24/7 daily? |
| 63723916 | over 6 years ago | Now reverted already to reality: changeset/70603419 |
| 63723916 | over 6 years ago | It's indeed negative on the ground (due to no road board information from DPWH), and besides, only Idesia Dasmarinas is really on the ground (under construction). Anyways, thank you for your feedback. P.S. Negative also on DepED R4A (CALABARZON)|Cavite|Dasmarinas City Elementary Schools Master List |