-
Early release cycle signals
Closed
-
Bike parking
Closed
-
Royal Cambridge Hotel junction at last has some cycle infrastructure :) Now 2 traffic lanes plus cycle lanes with painted buffer.
Closed
-
Fix missing lcn section
Closed
-
Remove link no longer accessible due to fence
Closed
-
Footway connectivity fixes near swimming pool
Closed
-
Improve routability with de-facto connection
Closed
-
Cycling west to south has cycles marked on road shortcut, as people would not take the very long route over the road corner twice.
Closed
-
Bicing station has moved
Closed
-
Highway=pedestrian area is foot not cycling.
Closed
-
Add ATMs with fee
Closed
-
Mirador - detail
Closed
-
Route up to platform area behind W has harsh humps
Closed
-
Local colloquial name for central shop, uses especially by students
Closed
-
Added Woodburn Way as alt_name for contraflow on Corn Exchange Street
Closed
-
Parts of Timberworks development in Cambridge off Cromwell Road are now open.
Closed
-
It is possible to walk under Museu Blau
Closed
-
Barcelona Forum detail
Closed
-
Barcelona Forum detail
Closed
-
Area around Rambla de Mercedes, including La Miranda
Closed