CCWEL Updates: Removed slip lane at Murrayfield Avenue. Removed incorrect construction marking. Added cycleway connection to Balbirnie Place.
Closed
-
Preliminary layout for Tram Cycle Safety Work
Closed
-
Update Constitution Street to reflect access restrictions (tram only on southern section)
Closed
-
Updated to reflect additional entrance to u/c Roseburn-Union Canal as well as correct entrance location at the north.
Closed
-
Updated to reflect new Trams to Newhaven central reservation and resultant severed connections/turning restrictions.
Closed
-
Updated to reflect reopening of Leith Walk to northbound traffic and addition of segregated cycleway.
Closed
-
Adding completed cycleway sections, new sections under construction and rationalising incorrect alignments at York Place/North St Andrew St. Several areas updated to shared use from cycle only at York Place/North St Andrew St.
Closed
-
Updated to reflect new banned turns after the junction has re-opened.
Closed
-
Updated to reflect new CCWEL layout. Bidirectional cycleway on Palmerston Place connecting Bishop's Walk to new unidirectional lanes at Grosvenor Crescent/Palmerston Place junction.
Closed
-
Update to reflect new junction arrangement at Leith Walk/London Road. No left turn Leith Walk-London Road. No right turn London Road-Leith Walk.
Closed
-
Added cycle contraflow as part of CCWEL works and updated speed limit to 20MPH.
Closed
-
Pilrig Street and Brunswick Street reopened to general traffic.
Closed
-
Minor updates to Quiet Route 61 extension to Portobello
Closed
-
Quiet Route 61 has been extended to Portobello, replacing the previous un-numbered route from Gilmerton to Hay Avenue.
Closed
-
Adding a new pedestrian crossing which was constructed as part of recent resurfacing.
Closed
-
Right turn from East Fountainbridge is now possible after recent junction upgrade.
Closed
-
Updating tags and types to better reflect new development and permitted access.
Closed
-
Updating information for new supermarket
Closed
-
Adding new supermarket
Closed
-
Adding a new pedestrian/cycle tram crossing as part of the Tram Cycle Safety Project. Existing paths realigned.
Closed