-
distinguish between enclosed and roof-only parts of Triptych low building around S towers. Update adjacent buildings, removing demolished (awaiting updated imagery to confirm new building shape) and improving newer existing ones
Closed
-
add some 3d shape for Triptych towers, especially for upper floors; smaller bumps which vary per floor not mapped
Closed
-
correct name typo, drop building=yes,layer=-1 from school grounds outer way
Closed
-
make tower square section, was very narrow E-W. Add side recesses over entrance/exit
Closed
-
set better placement and overall shape for Triptych 3x blocks of flats, from combination of Mapbox, Esri and Bing. Levels from floor counting external survey
Closed
-
tweak building colours: building warmer yellow (for buff bricks), roof tiles a little paler
Closed
-
add man_made bridge area, carrying 2 fence-separated ways, one within station barriers, the other outside. adjust NE entrance point and barrier point to match, from survey
Closed
-
add more detailed roof shape, improved colouring, for HSBC office building behind Globe
Closed
-
add payphone in station entrance level -1, also set level -1 on defib unit in ticket hall (under pub)
Closed
-
improve railway over-crossing building, walls and fences from survey
Closed
-
update stage size relative to roof, drop duplicate gift shop, improve footways at Globe
Closed
-
coffee shop at Falcon Point closed, set shop=vacant
Closed
-
lifts not in use (W one not maintained / in service; E completely removed). separate objects for plinth and statue to correctly and differently set material, height, shape (George IV and Charles I). Re-add notes re possible access via Hidden London tour
Closed
-
correct bike parking location, behind cafe not in/by florist stall
Closed
-
add and improve underground foot connections at Charing Cross from survey of (currently open) footways incl access to Northern platforms and long walkway to Bakerloo
Closed
-
add 4 side entrances to Great Court cutting into open area (note are also steps with shops under not mapped). reduce dome diameter to less than Reading Room walls size
Closed
-
height, roof:height and roof:direction set on Great Court roof skillions to give suitably curvy form with around 7m rise at N,S ends, around 3m at E,W narrow sides based on interval view and review of external imagery
Closed
-
fix unintended extra node and re-tidy roof edge
Closed
-
set up triangulation of skillion faces for Great Court roof shape (height, roof height and roof direction values to set). Paved floor area as flat floor not roof now - actually floor needs areas removed for stairs around Reading Room and 3 side porticos
Closed
-
complete coverage of building with building parts, heights estimated
Closed