-
Update bridge with steps
Closed
-
Set surfaces
Closed
-
Update surfaces and alignment around Bromo. Some resurfacing has recently occurred.
Closed
-
Improve alignment
Closed
-
Updates in Malang
Closed
-
Roads are not connected
Closed
-
Remove duplicate points
Closed
-
Updates to central Bali
Closed
-
Set surfaces
Closed
-
Updates northeast of Bromo
Closed
-
Road down from Cemorolawang has been resurfaced
Closed
-
Some updates in the south of Bali
Closed
-
Updates around Malang
Closed
-
Set surfaces and add new bridge
Closed
-
Updates between Ponorogo and Blitar
Closed
-
Set road surfaces
Closed
-
Update path
Closed
-
Section of JI-139 is unpaved since landslide
Closed
-
JL-139 has new bridge
Closed
-
JL-139 has double bridge now
Closed