-
precising yard tracks; deleting not existing crossover; adding electrification and changing operator (EMTU was liquidated in March 2025)
Closed
-
precising crossovers; adding electrification and changing operator (EMTU was liquidated in March 2025)
Closed
-
precising yard track; adding electrification and changing operator (EMTU was liquidated in March 2025)
Closed
-
precising crossovers as light rail; adding electrification
Closed
-
precising as light rail; adding gauge and electrification
Closed
-
precising Museu do Algodão and Estação Velha Campina Grande with surroundings
Closed
-
adding VLT de Campina Grande under construction
Closed
-
precising Escola Estadual Tereza Alves de Moura and surrounding areas
Closed
-
precising Rua Professor Fernandes Silveira, which is (north)east of railway until Rua Dimas Ferreira de Maria; separation of administrative border and railway track
Closed
-
precising station Campina Grande and tracks; adding driveway
Closed
-
precising disused rails: adding gauge, electrification, service; preecising footwalk crossings; precising road as unpaved
Closed
-
precising disused rails at Campina Grande; precising turning wye; deleting never existing rails; precising roads
Closed
-
precising Barragem; adding parque
Closed
-
extending Riacho Seco; adding reservoirs
Closed
-
precising Riacho Seco
Closed
-
precising Barragem Bananeira
Closed
-
adding station João Paulo II
Closed
-
adding Árvore Arapiraca and creek
Closed
-
precising track as light rail; shortening VLT route, which ends at João Paulo II station; rounding curves of disused rail of FTL
Closed
-
precising level-crossings and roads
Closed