-
precising Línea 1 as subway; same layer 2 as other parts of line
Closed
-
precising RegioTram, which will be realised in two stages: 2027 from Facatativa to Fontibon (already under construction) and 2029 from Fontibon into Bogotá (still just proposed)
Closed
-
precising Línea 1 as construction:railway=subway; adding opening date
Closed
-
precising platforms of Línea 1 and bring them on the same layer as tracks
Closed
-
precising platforms of Línea 1 and bring them on the same layer as tracks
Closed
-
precising platforms of Línea 1 and adding opening date
Closed
-
precising platforms of Línea 1 and RegioTram; precising tracks of RegioTram as construction:railway=light_rail and adding gauge and electrification
Closed
-
precising Línea 1 as construction:railway=subway; precising tracks north of Calle 75 as proposed, because first phase is until station Calle 72 plus 1 km of parking tracks; precising platforms
Closed
-
precising name of North Point Mall
Closed
-
adding new residentials at North Point
Closed
-
update after construction start and opening of expo and sales building for Senna Tower
Closed
-
precising tracks and switches; adding forgotten crossover and switches
Closed
-
precising tracks and swqitches; adding razed track and forgotten switches
Closed
-
rounding razed rail track
Closed
-
precising crossovers and pedestrians bridge; adding bumper
Closed
-
precising bridge/embankment and rail positions
Closed
-
adding gauge and usage at FC San Martín; precising rail positions
Closed
-
precising platform under construction
Closed
-
rounding curves at Línea B
Closed
-
precising connection of Línea B and Línea Urquiza at Estacion Federico Lacroze
Closed