-
precising power line and gate; adding barn and elevation
Closed
-
precising foot walks and bridges; adding footwalk, precising driveways and roads
Closed
-
precising former locomotive depot and rail tracks
Closed
-
precising rails and bridges; precising foot/bike paths; precising Marmaray tunnel (keep track spacing, because it is not a double deck tunnel)
Closed
-
precising rails and adding bridges; precising foot/bike paths, stairs and bridges
Closed
-
precising foot walks and bridges; adding footwalk to connect bus stop
Closed
-
precising rail tracks and platforms; adding cutting, bridges and football ground
Closed
-
deleting wrong tag "construction:railway", because those section are still just in planning
Closed
-
precising track position; adding underground part
Closed
-
precising switches
Closed
-
precising switches
Closed
-
rounding of grass areas
Closed
-
precising driveways and foot walks; moving bankomat out of the area
Closed
-
precising tram tracks at passing loop Tünel, because it is asymmetric; extending the track, which is crossing the road Ilk Belediye Caddesi; precising tram stop Tünel and surrounding road and footwalks
Closed
-
precising tram tracks at passing loop Galatasaray Lisesi, because it is asymmetric and longer; deleting double layed pedestrian zone
Closed
-
precising tram tracks and Sanat Galerisi; adding foot path, market building, catenary masts and switches
Closed
-
adding areas, creeks, paths and buildings
Closed
-
adding areas and paths
Closed
-
precising forest track; adding quarry and elevations
Closed
-
precising areas, roads and forest tracks; adding clearcuts
Closed