adding abandoned railway tracks to complete the former LĂnea I
precising railway tracks as disused, because they are not razed but still existing
precising light rail track position
precising light rails tracks: adding Faraday cage (jaula de Faraday)
precising light rails tracks: adding cutting
precising light rails tracks: adding crossovers
precising light rails tracks: adding cutting
precising light rails tracks: adding cutting
precising metro tracks, which runs from tunnel into cutting to at-grade and onto a dam in the end
precising metro depot buildings as train depots
precising metro tracks, because the crossover is elevated, too
precising metro tracks, because the crossover is elevated, too
precising metro tracks, because the crossover is elevated, too
precising tagging of proposed buildings (a source for this plans will be nice...)
precising of former construction side with periodic pond
precising area, after arena has been demolished between Sep 2022 and May 2023