1. Add new drinking water (bottle refill) point on the high street - has appeared recently

    Closed
    #108261467 1 0 0 0
  2. Update the capacity using twitter as a reference: https://twitter.com/KingstonCycling/status/1403834315662893057

    Closed
    #106420209 0 1 0 0
  3. Add more details to King George's Field, based on aerial imagery and site visit.

    Closed
    #104566776 42 4 0 0
  4. Add steps into Cambridge Gardens, and link footpaths across the already-marked pelican crossing.

    Closed
    #102336637 6 3 0 0
  5. Add new bicycle repair station

    Closed
    #102335849 1 0 0 0
  6. Add minor details around Cromwell Avenue Open Space

    Closed
    #98288081 12 4 0 0
  7. Add speed limits, fix extent of 20 mph limit at Richard Challoner school.

    Closed
    #97691064 2 28 0 0
  8. This line has been upgraded, and rail top shine shows its in use.

    Closed
    #86560567 0 1 0 0
  9. Update railway status along embankment. Exact position of crossover is hard to tell from ground level.

    Closed
    #86346658 7 13 1 0
  10. Update for railway now that the old bridge is closed (and the rails already lifted)

    Closed
    #86305120 0 16 7 0
  11. Use highway=construction since the bridge is not built yet

    Closed
    #77514296 0 1 0 0
  12. Remove unnecessary layer tag from the non-bridge section of the way.

    Closed
    #77275185 0 1 0 0
  13. Update railway layout at Mydlniki station, based on photos and site visit.

    Closed
    #76954346 17 34 34 0
  14. Add new railway signalling building

    Closed
    #76952962 8 13 3 0
  15. New road is open, based on site visit yesterday

    Closed
    #76952558 7 8 8 0
  16. Fix construction tagging on a section of rail that I missed previously.

    Closed
    #76637361 0 1 0 0
  17. minor corrections to crossovers

    Closed
    #76555289 4 6 0 0
  18. The section of rail between the mainline and the eastern flyover has been removed a few weeks ago.

    Closed
    #76498976 0 2 0 0
  19. Update / fix various parts of the railway through town. The old bridge across the Wisła is still in use, the new one isn't yet. Just north of that the old lines are connected to the new eastern line, and the embankment north of midowa has been demolished.

    Closed
    #76498816 9 17 0 0
  20. Update railway status based on a site visit this week. From the Katowicka underpass, I can see that the north three tracks are open, the 4th has no ballast (so construction) and the electrification wires indicate the southern two are also closed.

    Closed
    #75550240 2 20 0 0