-
Add bicycle parkings cover
Closed
-
Add roof shapes
Closed
-
Add whether way is lit
Closed
-
Add path surfaces
Closed
-
Work a little more on the SAU map (still very WIP)
Closed
-
Began adding A level SAU map. Very work in progress still — there's basically only one corridor. I more wanted a PoC. You can find the map I used below if you are an RIT student. https://www.rit.edu/fa/facilities/content/student-alumni-union
Closed
-
Fix missing crosswalk
Closed
-
Mark way as under construction
Closed
-
Add missing materials to steps along 1/4 mile
Closed
-
Add missing pathway as reported in Note 2660965
Closed
-
Add tactile pavings on crosswalks
Closed
-
Add whether there is a bike parking fee
Closed
-
Add type of bike parking access
Closed
-
Determine whether construction is now completed
Closed
-
Add bicycle parkings cover
Closed
-
Add step count
Closed
-
Add postbox collection times
Closed
-
Add whether steps have a ramp
Closed
-
Add whether steps have a handrail
Closed
-
Add bicycle parking capacities
Closed