OpenStreetMap logo OpenStreetMap

A09's Notes

Notes submitted or commented on by A09

Id Creator Description Created at Last changed
4534176 A09

A new neighbourhood *Ob Kobiljskem potoku* will be built here. Per media coverage, it'll provide 40 housing units. Its borders will be Vrtec DE Lendava on the south, Kobiljski potok on the west and Ulica Pandurja on the east. Besides the housing unit, a new playground will also be erected.

4525454 A09

Ponikva Train Station is currently being renovated. Per governmental sources, we may expect new roofs on waiting platforms, a new underpass, new parking places, new train station infrastructure as well as some tweaks to the current railways. Renovation is not yet reflected on the current aerial imagery.

4515922 fabfab38

basket area

#OsmAnd

4514826 A09

Some remodeling might be needed on this end of the bridge as it opens on Nov 11, 2024. So far, based on photos, that multiple retaining walls in terrace style were built on the eastern side of southern end of the bridge, as well as a retaining wall supporting road on the southwestern side of the bridge.

4509270 fabfab38

there is a bridge and a cycle path

#OsmAnd

4509751 fabfab38

there is a bridge

#OsmAnd

4513617 A09

Expect a new magistral road Ormož-Gorišnica-Markovci being constructed here till 2027. It crosses Sejanski potok, a bridge is already built there. Future road will also cross Formin canal. I have not yet seen any presentation of the road course.

Source: https://www.dars.si/Sporocila_za_javnost/1/Splosne_novice/2291/DARS_predstavil_gradnjo_nove_cestne_povezave_med_Markovci_in_Ormozem

4510496 A09

Current aerial imagery reflect a roadside construction zone. Once finished, road will be supported by a retaining wall to the right side. Cycling path Bled-Bohinjska Bela should also take place here, so best to wait for an aerial imagery update/local survey to accurately reflect these changes in the map here.

4510452 A09

Bypass has been constructed. It seems like most of the road is built on a overhang over the Selška Sora river. All along the way it is supported by retaining walls. West entrance of the bridge over Selška Sora has been widened. Earthworks and retaining walls were done on the crossroad of old road and new bypass on the western side of Sora river. Multiple adjacent roads were adjusted to the new bypass, so it's definitely worth waiting for an aerial imagery update.

4509508 A09

Both bridges are already standing. Wait for the aerial imagery to update. Bridge is slightly offset to the currently drawn bridge here. Viaduct Jenina has some larger retaining walls to the southeast. Retaining walls were also constructed on southwest side of Visočnik Viaduct. Chapel of St. Joseph is still standing. Traffic portals were also installed on both bridges. On the northern end of Visočnik Vidauct large earthworks are taking place, presumably slip lanes will be constructed there.