| 4534176 | A09 | A new neighbourhood *Ob Kobiljskem potoku* will be built here. Per media coverage, it'll provide 40 housing units. Its borders will be Vrtec DE Lendava on the south, Kobiljski potok on the west and Ulica Pandurja on the east. Besides the housing unit, a new playground will also be erected. |
|||
| 4525454 | A09 | Ponikva Train Station is currently being renovated. Per governmental sources, we may expect new roofs on waiting platforms, a new underpass, new parking places, new train station infrastructure as well as some tweaks to the current railways. Renovation is not yet reflected on the current aerial imagery. |
|||
| 4515922 | fabfab38 | basket area #OsmAnd |
|||
| 4514826 | A09 | Some remodeling might be needed on this end of the bridge as it opens on Nov 11, 2024. So far, based on photos, that multiple retaining walls in terrace style were built on the eastern side of southern end of the bridge, as well as a retaining wall supporting road on the southwestern side of the bridge. |
|||
| 4509270 | fabfab38 | there is a bridge and a cycle path #OsmAnd |
|||
| 4509751 | fabfab38 | there is a bridge #OsmAnd |
|||
| 4513617 | A09 | Expect a new magistral road Ormož-Gorišnica-Markovci being constructed here till 2027. It crosses Sejanski potok, a bridge is already built there. Future road will also cross Formin canal. I have not yet seen any presentation of the road course. |
|||
| 4510496 | A09 | Current aerial imagery reflect a roadside construction zone. Once finished, road will be supported by a retaining wall to the right side. Cycling path Bled-Bohinjska Bela should also take place here, so best to wait for an aerial imagery update/local survey to accurately reflect these changes in the map here. |
|||
| 4510452 | A09 | Bypass has been constructed. It seems like most of the road is built on a overhang over the Selška Sora river. All along the way it is supported by retaining walls. West entrance of the bridge over Selška Sora has been widened. Earthworks and retaining walls were done on the crossroad of old road and new bypass on the western side of Sora river. Multiple adjacent roads were adjusted to the new bypass, so it's definitely worth waiting for an aerial imagery update. |
|||
| 4509508 | A09 | Both bridges are already standing. Wait for the aerial imagery to update. Bridge is slightly offset to the currently drawn bridge here. Viaduct Jenina has some larger retaining walls to the southeast. Retaining walls were also constructed on southwest side of Visočnik Viaduct. Chapel of St. Joseph is still standing. Traffic portals were also installed on both bridges. On the northern end of Visočnik Vidauct large earthworks are taking place, presumably slip lanes will be constructed there. |