| 4510435 | A09 | cycling path besides road Vrhnika-Horjul is finished and needs updated mapping. it seems like it runs alongside the main road in same level, and a fence was installed on the opposite side of the road. on some other parts, it's physically separated from the track. cycling path has two lanes. please wait for the aerial imagery update or make updates based on a GPS track. |
|||
| 4579747 | A09 | Some Italian bunkers are missing here. Will add them once I get their exact locations, types and shapes. |
|||
| 4510825 | A09 | by monday, november 11th, slip lane from Šentvid tunnel towards Ljubljana center will begin with construction. No signs of construction zone yet. Expect a survey in next week. Due date is autumn 2025. |
|||
| 4508805 | A09 | tweaks&update after finished construction works. retaining wall on left side of the road towards Ruše, double drainage canals from each side of the bridge towards the middle on the right side of the bridge. torrential stream is also yet to be plotted here. rock avalanche protection was also installed along the cliffs south of the bridge (both not yet plotted here) |
|||
| 4508821 | A09 | by july 2025, reconstruction of the bridge will be finished. this includes reconstruction of neighbouring roads and building of retaining walls. implemented will be also changes to the riverbed, so a remapping of this bridge and surroundings will be needed. construction zones are not yet seen on the current aerial imagery set as of november 2024. |
|||
| 4628643 | ivanbranco | are these really three different museums? |
|||
| 4508828 | A09 | this rounadbout needs larger radius and a move so that yielding ramps correlate with two constructed overpasses as seen on aerial imagery. cycling road goes underneath those two overpasses. current traffic regime is to go anti-clockwise in the already existing roundabout. double wood&metal fence on the inside and outside, sidewalks are built. no traffic island, a cutting needs to be plotted due to cycling road. roundabout is double laned 31, 31a, 32, 33, 35 have an elevated driveway with retaining walls built, but are currently not yet seen on aerial imagery. |
|||
| 4521426 | A09 | See https://www.uradni-list.si/glasilo-uradni-list-rs/vsebina/2024-01-2838/odlok-o-poimenovanju-parka-in-ulic-na-obmocju-mestne-obcine-ljubljana
|
|||
| 4628487 | A09 | Cesta je bila asfaltirana, na našem zemljevidu pa manjka tudi nekaj instanc, mdr. potoki. Glej objave na https://medvode.si/post/724056 |
|||