added geothermal capacity
Closed
-
added wikipedia
Closed
-
changed to construction as website says "The plant design is currently being finalised and construction is expected to start in 2023." added repd data
Closed
-
added solar capacity
Closed
-
added panels and counted them
Closed
-
added module count; changed from plant to generator as 16 panels is not really a big plant
Closed
-
added solar panels, revised panel count
Closed
-
added repd:id, added fixme because of contradiction website 1 MW vs repd 3 MW
Closed
-
added power output
Closed
-
added power output and repd:id
Closed
-
created forest
Closed
-
add output from repd database
Closed
-
add output from repd database
Closed
-
created solar panels
Closed
-
added details for wind farm
Closed
-
Millour Hill wind farm: first part (not the extension) consists of 6 turbines each 3MW
Closed
-
created wind turbine and a track
Closed
-
reverting previous tag change. status=* is vague according to wiki, it is still industrial landuse, is is a disused power plant.
Closed
-
Details hinzugefuegt. Im Text steht dass das BHKW nun mit Bioerdgas betrieben wird. Ich bin mir nicht sicher, ob dies gewoehnliches Erdgas ist fuer das woanders Biogas ins Netz gespeist wird oder tatsaechlich Biogas ist.
Closed
-
power=plant hinzugefügt
Closed